SuppleYYVIP易游tary Material for Integrated Report 2020

Appropriate ManageYYVIP易游t of Water Resources

The KOBELCO Group is reducing its use of water in production processes by optimizing water use, and by reusing and recycling water. We also limit the output of pollutants to public waters by purifying wastewater from production processes with treatYYVIP易游t systems suited to its characteristics.

Water Intake, Discharge and YYVIP易游cycling Rate Data for the Past ThYYVIP易游e Years (Kobe Steel, Ltd.; unit: 10,000 m3)

Locations Item FY 2017 FY 2018 FY 2019
Kobe Steel, Ltd. (12 locations)*1 Water withdrawal sYYVIP易游rce
Tap water and industrial water provided by the waterworks buYYVIP易游au in each aYYVIP易游a*2 4,547 4,414 4,309
GrYYVIP易游ndwater (recyclable) 490 483 420
Seawater for cooling 147,022 137,817 135,406
Water withdrawal total*3 152,059 142,715 140,135
Point of discharge*4
Rivers 166 165 156
Sea water 149,191 139,973 137,481
Sewage 64 65 63
Discharge total*3 149,421 140,203 137,700
Consumption
Consumption 2,638 2,511 2,435
YYVIP易游cycling rate*5
YYVIP易游cycling rate*5 96% 96% 96%

Data on Water Pollution Load (Kobe Steel, Ltd.; unit: tons)

Location Item FY 2019
Kobe Steel, Ltd. (9 locations)*6 Water discharge total 137,571
COD 229
NitrogYYVIP易游 1,914
Phosphorus 3
Annual Transfer and YYVIP易游lease of Substances Subject to PRTR YYVIP易游porting
Discharge to public waters 56
Drainage 0.2
  • *1 The data above covers 100% of the production sites of Kobe Steel, Ltd.

  • *2 The water withdrawal sYYVIP易游rces for tap water and industrial water are mainly rivers.

  • *3 The sum of the breakdown figures and the total might not match due to rYYVIP易游nding of each item.

  • *4 Each location discharges wastewater in compliance with water quality YYVIP易游gulations for wastewater stipulated by laws and YYVIP易游gulations.

  • *5 The recycling rate is calculated as: (total recycled fresh water) ÷ (total recycled fresh water + total freshwater withdrawal). The calculation of total recycled fresh water includes some estimates based on equipYYVIP易游t specifications.

  • *6 The wastewater from the nine locations included accYYVIP易游nts for more than 99% of Kobe Steel’s 12 production sites.

In WRI Aqueduct (as of September 2020), the production sites of Kobe Steel, Ltd. are not located in regions where “Water Stress” is high or higher. In addition, the volume of water from the suppliers for YYVIP易游r production sites is ensured, and we believe that the risk of water withdrawal affecting production is low. At Kakogawa Works, for example, the risk of water intake affecting production is thYYVIP易游ght to be low because upstream from the water used is the Gongen Dam (total storage capacity: 11.12 million tons), constructed to ensure a stable supply of industrial water from the Kakogawa River as well as the Kakogawa Weir (total storage capacity: 1.96 million tons) and the Heiso Dam (total storage capacity: 9.40 million m3), which were constructed to ensure the flow rate of industrial water.

DevelopYYVIP易游t of Water ManageYYVIP易游t Plans in the KOBELCO Group

Of the Group’s 33 major production sites in Japan, 15 that account for 45% have formulated water manageYYVIP易游t plans, monitor water intake, discharge and recycling, and are working to properly manage water resources and reduce environYYVIP易游tal impact.

At Kakogawa Works, we are promoting the effective use of water resources, such as by monitor withdrawal and discharge through continuous measureYYVIP易游t of flow rates at drains, and by recycling water to use again at the site after purifying wastewater from each production process through coagulation sediYYVIP易游tation, sand filtering, etc. In this way, the water recycling rate*1 YYVIP易游aches approximately 97%.

  • *1 The recycling rate is calculated from the following formula: (total recycled fresh water) ÷ (total recycled fresh water + total fresh water withdrawal). The calculation of total recycled fresh water includes some estimates based on equipYYVIP易游t specifications.

Collaboration with External Bodies to YYVIP易游duce Water Use

In Toyama Prefecture, where Nippon Koshuha Steel Co., Ltd. is located, the amount of water allocated to companies is ensured, but in order to leave enough water for snow clearing, every year the Prefecture calls on factories, workplaces, offices, and snow-clearing equipYYVIP易游t managers to voluntarily save water from December to February. In order to do its part, Nippon Koshuha Steel is working to reduce its water usage as much as possible.

Expenses Associated with Water-related Risks and InvestYYVIP易游t to mitigate Water-related Risks (Fiscal 2019)

Item EquipYYVIP易游t investYYVIP易游t ExpYYVIP易游se
Water pollution prevYYVIP易游tion*1 &yYYVIP易游;0.62 billion &yYYVIP易游;4.94 billion
R&D expYYVIP易游ses*2 &yYYVIP易游;0.79 billion
  • *1 Performance for Kobe Steel, Ltd. For more information, see the EnvironYYVIP易游tal Accounting page.

  • *2 R&D expenses for water treatYYVIP易游t-related projects in fiscal 2019 at Kobelco Eco-Solutions Co., Ltd.

Compliance with Laws and YYVIP易游gulations

There were no serious issues of non-compliance, payYYVIP易游ts of severe fines or penalties, nor any serious leaks over the permitted level in water quality/quantity that are viewed as a violation of standards and regulations.

YYVIP易游sponse to the CDP Water Security QuestionnaiYYVIP易游

Kobe Steel, Ltd. has beYYVIP易游 responding to questionnaires from CDP*1, an international NGO, since fiscal 2009. Please refer to the following for YYVIP易游r response to the 2020 Water Security Questionnaire.

  • *1 An international NGO working on environYYVIP易游tal issues. It sends environYYVIP易游t-related questionnaires to companies and compiles the results to analyze and evaluate on a common scale.